A construction loan of $38,668,000 (80% of Loan-to-Cost) was arranged on a ‘spec’ basis for this multiphase townhouse project.
A construction loan of $38,668,000 (80% of Loan-to-Cost) was arranged on a ‘spec’ basis for this multiphase townhouse project.